I will introduce the installation process of our system in a concrete building.
1. The drainage protection mat (with a root protection function) is put. (Fix with the tape between mats)
2. The glass of soil prop (the processed goods using glass foaming material) installation.
1-a
1-b
2-a
2-b
3: The cushioning material of drainage assistance is paved.
4: The insulated retentive glass foaming plate is set up and vertical drainage joint mat is put.
3-a
3-b
4-a
4-b
5. A kenaf mat is put.
6. Fragments of the insulated retentive glass foaming material are scattered.
5-a
5-b
6-a
6-b
7: The lightweight organic culture soil is set up.
8: The soil prop for the height adjustment is set up.